Construction of LNG station

Print

REALIZED IN 2011

Construction of an LNG storage and regasification station with a capacity of 60 m3 and a capacity of 1000 Nm3/h, with a reduction and measurement station

The scope of work: design, materials delivery, and installation.

Client

Kampol-Fruit Sp. z o.o.

ul. Partyzna 11

21-020 Milejów