Construction of LNG station with cooling recovery system

Print

REALIZED IN 2012

Construction of an LNG storage and regasification station with a capacity of 60 m3 and a capacity of 1000 Nm3/h, with a reduction and measurement station. Construction of a cooling recovery system from the LNG regasification process based on the BEST cooling exchanger.

The scope of work: design, materials delivery, and installation.

Client

Bel Polska. Sp. z o.o.

ul. Grunwaldzka 97

06-330 Chorzele