Construction of a steam boiler plant

Print

REALIZED IN 2018

Construction of a steam boiler plant equipped with 2 LOOS UL-S 7000 boilers together with ECO6 condensing economizers, feed water tank, high-pressure condensate tank, installation of chimneys

The scope of work: design, materials delivery, and installation.

Client

Velvet Care sp. z o.o.

Osada 3 

32-310 Klucze