Construction of a steam boiler plant

Print

REALIZED IN 2020-2022

Construction of a steam boiler plant equipped with 3 (designed to operate with 5 boilers) LOOS UL-S steam boilers with ECO6 condensing economizers, feed water tank, Ruths type steam tank, pressure reduction systems, reverse osmosis system, water preheating systems, installation of chimneys

The scope of work: design, materials delivery, and installation.

Client

Nestle Purina

ul. Ryszarda Chomicza 11A 

55-080 Nowa Wieś Wrocławska