Construction of a LNG Mobile Regasification Station

Print

REALIZED IN 2021

Construction of the Mobile LNG Regasification Station with a capacity of 2000 Nm3/h, based on BEST cooling exchanger. The MSR allows recovery of cooling (up to 260 kW) from the LNG regasification process or independent vaporization of LNG using its own heat source

The scope of work: design, materials delivery, and installation.

Client

BEST Systemy Grzewcze

ul. Towarowa 15

58-100 Świdnica