REALIZED IN 2001
The water boiler plant, with a capacity of 202 kW, light fuel oil-fired, for Gimnazjum. Fuel oil storage was made as a tank battery, made of plastic.
The scope of work: design, materials delivery, and installation.
Investor:
Gimnazjum w Jaroszowie
58-120 Jaroszów 98
www.gimnazjum.jaroszow.pl