REALIZED IN 2000
Replacement of gas burners in GZ-50 natural gas-fired boilers, with a total capacity of 8 100 kW, in order to reduce CO2 emission.
The scope of work: installation.
REALIZED IN 2000
Replacement of gas burners in GZ-50 natural gas-fired boilers, with a total capacity of 8 100 kW, in order to reduce CO2 emission.
The scope of work: installation.