ISO 9001 AND ISO 3834 CERTIFICATES

Completed investments

Water boiler plant - Toyota, Wałbrzych

REALIZED IN 2000

Replacement of gas burners in GZ-50 natural gas-fired boilers, with a total capacity of 8 100 kW, in order to reduce CO2 emission.

The scope of work: installation.

 

Address

ul. Towarowa 15, 58-100 Świdnica

(+48) 74 856 81 88

best@systemy-grzewcze.pl

Mon-Fri: 7am-3pm

Shortcuts

 

©2019 BEST Systemy-Grzewcze. All rights reserved. Design: Art Open Studio Reklamy