REALIZED IN 1999 AND 2000
The heating system for BTR Automotive company. This system included: two water boilers - for production halls heating, and one boiler - for domestic hot water production during summer, with a total capacity of 4 200 kW.
The boilers were equipped with GZ-50 natural gas and light fuel oil-fired burners. The constant parameters of the boiler plant remain at the level of 90/70 °C.
This design of this heating system enables the installation of the third boiler, in case of company expansion.
The scope of work: design, materials delivery (apart from boilers and burners), and installation.
Investor:
BTR AUTOMOTIVE
Sp. z o.o.
ul. Stacyjna 19
58-306 WAŁBRZYCH
Current entity:
Cooper-Standard Automotive, Inc.
ul. Batalionow Chlopskich 19
58-200 Dzierżoniów