REALIZED IN 2010
Replacement of an old steam boiler in a steam boiler plant with a steam boiler (5300 kg/h of capacity, 10 bar), equipped with water degasification module. The new boiler will be heavy fuel oil-fired. The boiler plant, however, will generate high-pressure steam for production plant.
The scope of work: design, materials delivery, installation.
Investor:
BEL POLSKA Sp. z o.o.
ul. Grunwaldzka 97
06-330 Chorzele
tel: 29 751 58 61
fax: 29 751 58 66