ISO 9001 AND ISO 3834 CERTIFICATES

Completed investments

Construction of LNG station

REALIZED IN 2011

Construction of an LNG storage and regasification station with a capacity of 60 m3 and a capacity of 1000 Nm3/h, with a reduction and measurement station

The scope of work: design, materials delivery, and installation.

Client

Kampol-Fruit Sp. z o.o.

ul. Partyzna 11

21-020 Milejów

 

 

Address

ul. Towarowa 15, 58-100 Świdnica

(+48) 74 856 81 88

best@systemy-grzewcze.pl

Mon-Fri: 7am-3pm

Shortcuts

 

©2019 BEST Systemy-Grzewcze. All rights reserved. Design: Art Open Studio Reklamy