REALIZED IN 2012
Construction of a steam boiler room equipped with LOOS UL-S 3200 boiler, relocated Rumia 1200 boiler, feed water tank and complete technological, electrical and instrumentation installations, installation of chimneys
The scope of work: design, materials delivery, and installation.
Client
ZM Winnica Sp. z o.o.
ul. Szkolna 13
06-120 Winnica