ISO 9001 AND ISO 3834 CERTIFICATES

Completed investments

Construction of a steam boiler plant

REALIZED IN 2020-2022

Construction of a steam boiler plant equipped with 3 (designed to operate with 5 boilers) LOOS UL-S steam boilers with ECO6 condensing economizers, feed water tank, Ruths type steam tank, pressure reduction systems, reverse osmosis system, water preheating systems, installation of chimneys

The scope of work: design, materials delivery, and installation.

Client

Nestle Purina

ul. Ryszarda Chomicza 11A 

55-080 Nowa Wieś Wrocławska

Address

ul. Towarowa 15, 58-100 Świdnica

(+48) 74 856 81 88

best@systemy-grzewcze.pl

Mon-Fri: 7am-3pm

Shortcuts

 

©2019 BEST Systemy-Grzewcze. All rights reserved. Design: Art Open Studio Reklamy