REALIZED IN 2023
Installation of a UL-S 4000 biogas-fired steam boiler, including installation of a feedwater tank, steam manifold and relocation of the existing LOOS UH-D 3200 boiler. Construction of a biogas plant including a biogas drying system, installation of chimneys
The scope of work: design, materials delivery, and installation.
Client
Grupa Producencka Agro Żabice
Żabice 52
59-140 Żabice