REALIZED IN 2023

Installation of a UL-S 4000 biogas-fired steam boiler, including installation of a feedwater tank, steam manifold and relocation of the existing LOOS UH-D 3200 boiler. Construction of a biogas plant including a biogas drying system, installation of chimneys

The scope of work: design, materials delivery, and installation.