REALIZED IN 2007
The water boiler plant based on two GZ-50 gas-fired boilers (each with a capacity of 570 kW) for ZETKAMA. It generates heat for painting plant, heating installation of the office, and domestic hot water production system. The heating installation is connected with the boiler plant through pipelines, which are located on platforms suspended on the roof and walls. This makes an alternative power supply (technological heal) in case of emergency.
Investor:
ZETKAMA Spółka Akcyjna
ul. 3 Maja 12
PL 57-410 Ścinawka Średnia
www.zetkama.com.pl