ISO 9001 AND ISO 3834 CERTIFICATES

Completed investments

Water boiler plants - Krzeszowice, near Cracow

REALIZED IN 2006

Two natural gas-fired water boiler plants for Gospodarstwo Ogrodnicze PHRO in Krzeszowice will replace the old ones, heavy fuel oil-fired. This solution will reduce the emission of carbon dioxide, nitric oxides, sulfur oxides, and dust. Gas boilers, properly fixed, generate exhaust fumes (approx. 12% of them is carbon dioxide) which do not harm plants – on the contrary, the carbon dioxide stimulates their growth. Properly prepared and controlled exhaust fumes will be then transferred to a glasshouse, to feed plants. This system will be managed by a climate computer (to be installed and launched by other company).

The first phase included the installation of two GZ-50 natural gas-fired boilers, each with a capacity of 10 000 kW, equipped with economizers. Moreover, the medium pressure natural gas GZ-50 system was installed.

Under construction: heat water buffer tank to store the heat waste from CO2 production and pipelines to connect boiler plants with tanks.

Investor:
Produkcja i Hodowla Roślin Ogrodniczych w Krzeszowicach sp. z o.o.
32-065 Krzeszowice
Ul. Żbicka 32
www.phro.com.pl

 

Address

ul. Towarowa 15, 58-100 Świdnica

(+48) 74 856 81 88

best@systemy-grzewcze.pl

Mon-Fri: 7am-3pm

Shortcuts

 

©2019 BEST Systemy-Grzewcze. All rights reserved. Design: Art Open Studio Reklamy