ISO 9001 AND ISO 3834 CERTIFICATES

Completed investments

Steam boiler plant - Warka, near Warsaw

REALIZED IN 2006

The steam boiler plant with a capacity of 12 000 kg/h of vapor-liquid equilibrium and a pressure of 16 bar. It may be GZ-50 natural gas-fired, biogas-fired, or light fuel oil-fired.
The old steam boiler was replaced with the modern one, equipped with an economizer and systems of automatized boiler blowdown and desalination.
The air for gas and oil burner is sucked after being heated by duct heater.
Twin-wall flue (stainless steel), 18 m AGL, is to be installed in new boilers.

The scope of work: design, materials delivery (apart from steam boiler and feed water production system), installation.

Investor:
Steinhauser Polska Sp. z o.o.
05-660 Warka
ul. Gośniewska 65
tel. 48 667 35 00
www.steinhausergroup.de

 

Address

ul. Towarowa 15, 58-100 Świdnica

(+48) 74 856 81 88

best@systemy-grzewcze.pl

Mon-Fri: 7am-3pm

Shortcuts

 

©2019 BEST Systemy-Grzewcze. All rights reserved. Design: Art Open Studio Reklamy