REALIZED IN 2004 AND 2005

Two boiler plants (W1 and W2), fuel oil-fired and GZ-50 natural gas-fired, with a capacity of 14 000 kW each. We installed the heating water buffer tank (600 m3). This heat is being generated when CO2 is being produced. BEST also installed fuel oil tanks for W1 and W2 boiler plants (200 m3 each). Fuel systems in both boiler plants are equipped with tanks, made by BEST.

The scope of work: materials delivery (W2), installation (W1 and W2).