REALIZED IN 2005
Disassembly of boiler plant machines in Baildon Ironworks, Katowice. Machines were removed from a boiler plant and loaded into platforms.
The scope of work: disassembly and loading.
REALIZED IN 2005
Disassembly of boiler plant machines in Baildon Ironworks, Katowice. Machines were removed from a boiler plant and loaded into platforms.
The scope of work: disassembly and loading.