REALIZED IN 2003
The date, seen at attached photos, may be misleading.
The water boiler plant for a horticultural company. The heating system included the boiler with a capacity of 6 500 kW, GZ-50 natural gas-fired, equipped with a stainless-steel economizer.
Excess heat from CO2 production is being transferred to vertical heat storage tanks, with a capacity of 50 m3 each. Complete buffer system includes eight aforementioned tanks and is equipped with an open expansion vessel. This complex heating system is based on hydraulic clutch. It is compatible to a municipal heating system, through JAD exchangers.
The proper hydraulics system of a glasshouse and the boiler plants enables the exhaust fumes production in a temperature of 60 °C, with parameters of 90 / 60 °C, and when the boiler works at its full power.
The scope of work: design, materials delivery, installation.
Investor:
„Garden” Gospodarstwo Ogrodnicze Stanisław Socha
39-300 Mielec
ul. Traugutta
tel. 17 586 42 14