Water boiler plant, near Sieradz

REALIZED IN 2003

The date, seen at the attached photos, may be misleading.

Fuel heating system, as well as shutdown and boosting system of mazut were made for light fuel oil-fired water boiler.
The boiler plant was installed for a glasshouse. There is a heavy fuel oil-fired boiler with a capacity of 3 700 kW. Heating system is of a closed type. The fuel storage consists of two tanks, with a capacity of 46 m3 each.
The heavy fuel oil is heated in a tank, made by BEST.

Any fuel oil may be used here, provided that burner system was earlier regulated by maintenance specialists.

The scope of work: design, materials delivery, installation.

 