REALIZED IN 2000 AND 2001
The water boiler plant (2 x 3 500 kW), which can be heavy, medium, or light fuel oil-fired, for a horticultural company.
The heating water buffer tank (hydraulic clutch) enables the regulation of water temperature in a boiler, in case of rapid changes of heat demand in a glasshouse.
This solution guarantees safe and long-term work of the system. It also helps avoiding the dewfall in the boiler, when it is fired with a fuel oil consisting sulphur.
The fuel tank (2 x 50 m3) is equipped with a fuel heating tank, made by BEST.
The light fuel oil-fired boiler was used as a shutdown and boosting system.
The scope of work: design, materials delivery, and installation.
Investor:
GRAJEWSCY S. C.
Import i produkcja kwiatów
58-160 Świebodzice
ul. Jeleniogórska 43