REALIZED IN 2001
The steam boiler plant, with a capacity of 16 000 kg/h, a pressure of 10 bar, heavy fuel oil-fired, for JAHNCKEPOL Company. BEST prepared foundation and also installed a self-bearing chimney (40 meters AGL), as well as feed water production system (20 m3) on a support structure (3,5 m).
The scope of work: materials delivery (apart from a steam boiler, a feed water tank, and the chimney) and installation.