Container boiler plant in Praszka

REALIZED IN 2006

Installation of the container boiler plant, with a capacity of 4 000 kW, in a place prepared by  ENERGIA PRASZKA Company. Necessary utilities, i.e. gas, water, and heat pipelines, as well as electricity network have passed directly near the boiler plant. The backup transmission pumps system was installed in a separate container.

The scope of work: installation (7 days from the delivery of container)

Investor:
Energia Praszka Sp. z o.o.
46-320 Praszka
Pl. Grunwaldzki 13

 

Address

ul. Towarowa 15, 58-100 Świdnica

(+48) 74 856 81 88