ISO 9001 AND ISO 3834 CERTIFICATES

Completed investments

Sewage works - Bydgoszcz

REALIZED IN 2003

BEST carried out the technological part of a building design for the thermal hydrolysis of sewage sludge in the city sewage works. The thermal hydrolysis system includes the module of pressure and temperature pendulum, which enables the production of higher amount of biogas. Afterprocess sludge is therefore sterile and safe.
The most challenging part was to calculate and adjust the air production system to electric power generators, powered by biogas from fermentation chambers.

The scope of work: design.

 

Address

ul. Towarowa 15, 58-100 Świdnica

(+48) 74 856 81 88

best@systemy-grzewcze.pl

Mon-Fri: 7am-3pm

Shortcuts

 

©2019 BEST Systemy-Grzewcze. All rights reserved. Design: Art Open Studio Reklamy