REALIZED IN 2003
The steam boiler plant, with a capacity of 10 000 kg/h, a pressure of 10 bar, heavy fuel oil-fired, for KNAUF Company.
The old, destroyed boiler (with a capacity of 10 000 kg/h) was replaced, together with the installation of feed water system, 10 m3/h (the photo below presents the container in front of the boiler plant room), during production break (9 days).
The necessary preparatory work was done earlier. Uptake was made of segments, after boiler installation.
The scope of work: design, materials delivery (apart from steam boiler and feed water production system), and installation.