REALIZED IN 2003
Installation of flues and two boilers in two multi-family houses (2 buildings with 30 flats each).
The scope of work: design, materials delivery (apart from boilers), installation.
REALIZED IN 2003
Installation of flues and two boilers in two multi-family houses (2 buildings with 30 flats each).
The scope of work: design, materials delivery (apart from boilers), installation.