REALIZED IN 2018
Construction of a steam boiler plant equipped with 2 LOOS UL-S 7000 boilers together with ECO6 condensing economizers, feed water tank, high-pressure condensate tank, installation of chimneys
The scope of work: design, materials delivery, and installation.
Client
Velvet Care sp. z o.o.
Osada 3
32-310 Klucze