REALIZED IN 2019-2020
Construction of a steam boiler plant equipped with 2 LOOS UL-S 7000 boilers together with ECO6 condensing economizers, feed water tank, water treatment plant, reverse osmosis plant, installation of chimneys
The scope of work: design, materials delivery, and installation.
Client
Mars Polska sp. z o.o.
ul. Stefana Batorego 21
05-870 Pass