REALIZED IN 2005
Two heat exchangers, with a total capacity of 30 000 kW for greenhouses. The design enables the installation of the third one, with a capacity of 15 000 kW. Those two heat exchangers are compatible with a heat pipeline of Łagisza Power Plant and a heat distribution system (made of insulated pipes) around the greenhouses.
The implementation of a freely programmable controller enables the adaptation of the heat exchanger to the heat output in those greenhouses, as well as to Łagisza Power Plant’s requirements. When the water expands, it is transferred to open expansion vessel (100 m3).
Pump and transmission system (based on three Grundfos pumps, with a possibility to add the fourth one), a power inverter, and a mixing valve run a program, given by a climate computer.
The scope of work: design, material delivery, installation.
Investor:
Gospodarstwo Ogrodnicze Tadeusz Mularski
„Bory Malinowskie” Plant
42-512 Psary
ul. Jasna 12, Sarnów
tel. 32 267 21 71
www.mularski.pl