ISO 9001 AND ISO 3834 CERTIFICATES

Completed investments

Biogas recovery – Wieliczka, near Cracow

REALIZED IN 2005

BEST installed a biogas system in a collection chamber. This biogas is being recovered from the municipal landfill in Cracow. The system was made of high-quality alloy steel. The biogas, which is being recovered from the landfill, is enough to satisfy the fuel demand of electric power generator (500 kW).

The scope of work: materials delivery and installation.

 

Address

ul. Towarowa 15, 58-100 Świdnica

(+48) 74 856 81 88

best@systemy-grzewcze.pl

Mon-Fri: 7am-3pm

Shortcuts

 

©2019 BEST Systemy-Grzewcze. All rights reserved. Design: Art Open Studio Reklamy